In development

100 Series Platform HVAC Control Module

OEM-style HVAC control for factory-navigation interiors on the 100 Series Platform.

Conceptual interior visualization of the HVAC control module development direction
Conceptual visualization for development communication. Final appearance, hardware, and fitment pending prototype validation.

Built for the factory-nav HVAC problem

Factory-navigation 100 Series and LX470 interiors tie climate control into the original display system. This module is being developed to preserve physical HVAC control while allowing a cleaner modern head-unit conversion.

In development. Prototype production has begun, with final hardware, fitment, and vehicle validation still pending.

Compatibility

Initial target applications are factory-navigation-equipped 100 Series Land Cruiser and Lexus LX470 interiors. Non-nav trucks, international-market vehicles, swapped interiors, and unusual configurations may require additional validation.

Development timeline

December 2025 to July 2026

A compact view of the project path from development vehicle purchase through prototype production.

December 2025

Development Vehicle Secured

A dedicated LX 470 was purchased to serve as the real-world development and validation platform.

January 2026

Research & Reverse Engineering

Initial teardown, system study, and factory behavior analysis began.

February 2026

OEM Function Mapping

Factory HVAC logic, control behavior, and dash packaging constraints were documented.

March 2026

Product Architecture Defined

The project direction was locked: an OEM-style HVAC controller enabling a modern double-DIN conversion.

April 2026

Interface Design Finalized

The control layout, display strategy, button layout, and mechanical packaging direction were refined.

May 2026

Design Refinement & Community Momentum

Public updates, waitlist growth, and design improvements helped validate demand and guide final prototype decisions.

June 2026

Prototype Production Begins

The first prototype batch was submitted for PCB manufacturing, enclosure printing, and real-world fitment testing.

July 2026

Current

Assembled Prototypes Arrive

The first assembled PCB batch arrived, clearing the final component delay and moving the physical HVAC unit into bench testing and hardware bring-up.

Continue with product resources

Review development-stage documentation or join the waitlist to share vehicle context and follow prototype progress.